Nylon Dog Leash Running Tracking Non-Slip Long Leads Nylon Training Walking Leads 3m 5m 10m 15m For Medium Large Dogs Heavy Duty

Save 20%
East Supplier PlatformSKU: 2251832655998769-Coffee-3m

Color: Coffee
Price:
$19.98 $24.98

Shipping calculated at checkout

Stock:
In stock (948 units), ready to be shipped

Description

SPECIFICATIONS

Type: Dogs

Type: Leashes

Size: 3M/5M/10M/20M

Season: All seasons

Remaining Shelf Life: >6 months

Pattern: Solid

Origin: Mainland China

Model Number: YWL049

Material: nylon

Feature: Durable/Heavy Duty

Feature: Tracking Leash

Dog Leash Type: Basic Leashes

Color: Beige/Coffee

Brand Name: Beirui

Applicable Dog Breed: Large Medium-sized Dog



 


Name: Durable Dog Tracking Leash Non-Slip Long Leads Nylon Training Walking

Size: 3M/5M/10M/20M

Feature: Durable/Heavy Duty

Color: Beige/Coffee

Size: 3M/5M/10M/20M

Applicable Dog Breed: Large Medium-sized Dog



Customer Reviews

Оплата и безопасность

PayPal

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.

Estimate shipping

Вам также может понравиться

Недавно просмотренные