Nylon Dog Leash Running Tracking Non-Slip Long Leads Nylon Training Walking Leads 3m 5m 10m 15m For Medium Large Dogs Heavy Duty

East Supplier PlatformSKU: 2251832655998769-Coffee-3m

Color: Coffee
Price:
$19.98

Tax included Shipping calculated at checkout

Stock:
In stock (948 units), ready to be shipped

Description

SPECIFICATIONS

Type: Dogs

Type: Leashes

Size: 3M/5M/10M/20M

Season: All seasons

Remaining Shelf Life: >6 months

Pattern: Solid

Origin: Mainland China

Model Number: YWL049

Material: nylon

Feature: Durable/Heavy Duty

Feature: Tracking Leash

Dog Leash Type: Basic Leashes

Color: Beige/Coffee

Brand Name: Beirui

Applicable Dog Breed: Large Medium-sized Dog



 


Name: Durable Dog Tracking Leash Non-Slip Long Leads Nylon Training Walking

Size: 3M/5M/10M/20M

Feature: Durable/Heavy Duty

Color: Beige/Coffee

Size: 3M/5M/10M/20M

Applicable Dog Breed: Large Medium-sized Dog



Customer Reviews

Pagamento e Segurança

PayPal

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.

Estimate shipping

você pode gostar

Visto recentemente