Nylon Dog Leash Running Tracking Non-Slip Long Leads Nylon Training Walking Leads 3m 5m 10m 15m For Medium Large Dogs Heavy Duty

Economisez 20%
East Supplier PlatformSKU: 2251832655998769-Coffee-3m

Color: Coffee
Prix:
$19.98 $24.98

Frais de port calculés au paiement

Stock:
948 en stock, prêts à être livrés

Description

SPECIFICATIONS

Type: Dogs

Type: Leashes

Size: 3M/5M/10M/20M

Season: All seasons

Remaining Shelf Life: >6 months

Pattern: Solid

Origin: Mainland China

Model Number: YWL049

Material: nylon

Feature: Durable/Heavy Duty

Feature: Tracking Leash

Dog Leash Type: Basic Leashes

Color: Beige/Coffee

Brand Name: Beirui

Applicable Dog Breed: Large Medium-sized Dog



 


Name: Durable Dog Tracking Leash Non-Slip Long Leads Nylon Training Walking

Size: 3M/5M/10M/20M

Feature: Durable/Heavy Duty

Color: Beige/Coffee

Size: 3M/5M/10M/20M

Applicable Dog Breed: Large Medium-sized Dog



Customer Reviews

지불 및 보안

PayPal

Vos informations de paiement sont gérées de manière sécurisée. Nous ne stockons ni ne pouvons récupérer votre numéro de carte bancaire.

Estimer la livraison

당신은 또한 좋아할 수 있습니다

최근 본