Nylon Dog Leash Running Tracking Non-Slip Long Leads Nylon Training Walking Leads 3m 5m 10m 15m For Medium Large Dogs Heavy Duty

East Supplier PlatformSKU: 2251832655998769-Coffee-3m

Color: Coffee
Prix:
$19.98

Taxes incluses Frais de port calculés au paiement

Stock:
948 en stock, prêts à être livrés

Description

SPECIFICATIONS

Type: Dogs

Type: Leashes

Size: 3M/5M/10M/20M

Season: All seasons

Remaining Shelf Life: >6 months

Pattern: Solid

Origin: Mainland China

Model Number: YWL049

Material: nylon

Feature: Durable/Heavy Duty

Feature: Tracking Leash

Dog Leash Type: Basic Leashes

Color: Beige/Coffee

Brand Name: Beirui

Applicable Dog Breed: Large Medium-sized Dog



 


Name: Durable Dog Tracking Leash Non-Slip Long Leads Nylon Training Walking

Size: 3M/5M/10M/20M

Feature: Durable/Heavy Duty

Color: Beige/Coffee

Size: 3M/5M/10M/20M

Applicable Dog Breed: Large Medium-sized Dog



Customer Reviews

Paiement et sécurité

PayPal

Vos informations de paiement sont gérées de manière sécurisée. Nous ne stockons ni ne pouvons récupérer votre numéro de carte bancaire.

Estimer la livraison

Tu pourrais aussi aimer

Vu récemment